Single kaltenkirchen - Airfix Kit No. A03088 - Messerschmitt Me 262 A-1a Review.


On 8 September 1884, the Altona-Kaltenkirchner Eisenbahn-Gesellschaft (Altona-Kaltenkirchen Railway Company), which was established in the previous year, opened the line from Altona to Kaltenkirchen for passenger traffic. Freight operations commenced on 24 November 1884. The line was initially operated by the Kintzel & Lauser company, which had also built the line and owned share in the Altona-Kaltenkirchen Railway Company. There was initially no provision for the transfer of freight to the state railways , but it was possible for freight to connect with the Hamburg tramway in Altona . Accordingly, a central buffer coupling was selected, which was also necessary at the beginning because of the sharp curves of the line. The AKE took over the management of the line in 1892.

Jungheinrich single-bay racking is operated either manually or automatically – using either trucks or rack operating equipment as required. Due to the depth supports, the stacking process particularly quick and safe. Direct access to all load units and safe stacking to great heights have advantages in comparison with block storage.


Single kaltenkirchen

Single kaltenkirchen